Water Treatment Plant Third Floor Wall Reinforcement
Scope
The Water Treatment Plant is a three-story structure and the wall needs reinforcement for stabilization. Engineering specifications are signed and sealed by Painter-Lewis, P.L.C., dated October 7, 2026 (10-7-2026), job number 2502016, titled âTHIRD LEVEL WALL REINFORCEMENT DETAILSâ and are included as supporting documents to this ITB.
Documents, amendments and submission instructions are on the agency's own posting.