← All bids

Water Treatment Plant Third Floor Wall Reinforcement

Town of Woodstock·VA·IFB·State

Scope

The Water Treatment Plant is a three-story structure and the wall needs reinforcement for stabilization. Engineering specifications are signed and sealed by Painter-Lewis, P.L.C., dated October 7, 2026 (10-7-2026), job number 2502016, titled “THIRD LEVEL WALL REINFORCEMENT DETAILS” and are included as supporting documents to this ITB.

Documents, amendments and submission instructions are on the agency's own posting.