DCF NS-LEPE Site Preparation
Scope
This design-build (DB) construction contract is to obtain design and construction services for the removal, disposal, and construction of structural, mechanical, electrical, and architectural elements in BEP�s Main Building, room A-400M, to accommodate the requirements for the future installation of a new NS-LEPE machine. This will be in the Washing DC Facility (DCF).
Documents, amendments and submission instructions are on the agency's own posting.