CJAG Power Distribution

DEPT OF DEFENSE — DEPT OF THE ARMY·Ravenna, OH·RFP·Federal

Scope

Amendment: 1 Bonding Requirements: An offer guarantee IS required Contractor must furnish any required performance and payment bonds within 10 calendar days after receipt of order (ARO) ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System. The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center. The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill…

Documents, amendments and submission instructions are on the agency's own posting.