← All bids

Roadway Signage & Infrastructure Phase 4 (BP-00499)

Greater Orlando Aviation Authority — Planning, Engineering and Constru·FL·Other·Local

Scope

The scope of work includes but is not limited to, provision of all labor, materials, equipment, and maintenance of traffic (MOT) to accommodate the demolition and replacement of two existing Overhead Static Sign Structures with two new Overhead Digital Message Signing Support Structures along Jeff Fuqua Blvd. Additionally, the project features the installation of one new DMS Cantilever Support Structure, new sign panels, roadway pavement markings, guardrail, sign lighting and associated electrical work.

Documents, amendments and submission instructions are on the agency's own posting.