INVITATION TO APPLY FOR PRE-QUALIFICATION FOR DEAD RUN AT GEORGETOWN PIKE SD-000031-230
Scope
Restoration of 5,916 linear feet of stream using naturalchannel design and riparian corridor enhancements toimprove water quality. Invasive plants will be removed andreplaced with native trees, shrubs, and herbaceousvegetation. Additionally, the project requires a sanitarysewer force main bypass pumping system with flows up to2,600 gallons per minute, requiring continuous 24-houroperation and maintenance while the bypass system is inservice, as well as pre- and post-construction CCTVinspection o
Documents, amendments and submission instructions are on the agency's own posting.