61--PANEL,POWER DISTRIB, IN REPAIR/MODIFICATION OF
Scope
CONTACT INFORMATION|4|N732.76|N00383|771-229-2959|[email protected]| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo)||TBD|N00383|TBD|TBD|See schedule|TBD|See schedule|||||||| This RFQ is for repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date…
Documents, amendments and submission instructions are on the agency's own posting.