Ross Springs Waterline Replacement
Scope
This project includes the replacement of 4� asbestos cement pipe (abandoned in place) with 4� HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4� HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source. Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.