US 90A at Circle Drive/John Sharp Drive Utility Casings CST2003
Scope
The Work consists of furnishing all labor, materials, equipment, supervision, permits, and incidentals necessary to install two 24-inch steel utility casings by trenchless methods at the US 90A and John Sharp Drive/Owens Road intersection in Sugar Land, Texas. The project includes approximately 360 linear feet of 24-inch steel casing for a future water line and approximately 303 linear feet of 24-inch steel casing for a future wastewater force main. The Work includes construction of bore and receiving pits, installation of the steel casings, capping and marking casing ends, utility coordination, traffic control, dewatering as required, excavation and backfill, protection of existing utilities and facilities, testing, inspection, and all other work necessary to provide complete and functional casing installations. The Contractor shall coordinate with the City of Sugar Land, TxDOT, Union…
Documents, amendments and submission instructions are on the agency's own posting.