← All bids

PHASE 3D PROJECT 6 INFRASTRUCTURE IMPROVEMENTS

City of Jacksonville Beach, FL — Public Works·FL·Other·Local

Scope

Project Description The work includes, but not limited, to the following: Work will include reconstruction of the roadway, sidewalk, curb and gutters within project limits per typical section. Existing water, sewer and stormwater pipes and lines are to be reconstructed within project limits. Parking areas are to be paved with concrete with fiber mesh as shown in the plans. Driveways are to be reconstructed as shown in the plans. Sewer manholes throughout project limits are to be removed and replaced with a lined manhole or to be lined and rehabilitated as shown in the plans. Construction within project limits to also include, service adjustments, replacement of valve covers and meter boxes, electrical junction box adjustments and electrical pull box covers, installation of curbing, utility protection including gas, phone, cable, underground electric, sewer and water. The contractor is…

Documents, amendments and submission instructions are on the agency's own posting.