Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation

DEPT OF DEFENSE — DEPT OF THE ARMY·PA*·RFP·Federal

Scope

The Millvale LPP was constructed by U.S. Army Corps of Engineers (USACE) in 1980 under the authority of Section 205 of the Flood Control Act of 1948 as amended. The project consists of about 6,200 feet of channel improvement including concrete gravity retaining walls, concrete wall supports, anchored concrete toe blocks, concrete cap walls, stone-filled gabion mattresses, flap gates and access ramps. The LPP is an urban Flood Control Work (FCW), and it is not a multipurpose project. Heavy rains from 1-12 April 2024 caused flooding which damaged the Project within Girtys Run, including bank erosion, shoaling, erosion of the improved channel, ruptured gabion baskets, washed-out concrete buttresses, and erosion of grouted riprap. Of particular concern are the washed-out buttresses which have migrated to the center of the improved channel, impeding streamflow. If the buttresses are not…

Documents, amendments and submission instructions are on the agency's own posting.