← All bids

OR FS FREWN602 28(1), Road 28 Reconstruction

TRANSPORTATION, DEPARTMENT OF — FEDERAL HIGHWAY ADMINISTRATION·Silver Lake, OR·RFP·Federal

Scope

OR FS FREWN602 28(1), Road 28 Reconstruction Total Small Business Set-Aside This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage. Option X: includes an additional 3.4 miles of full depth reclamation Option Y: includes an additional 14.1 miles of full depth reclamation Option Z: includes 7.5 miles of minor asphalt patches. Project Location: This project is located approximately six miles south of Silver Lake, OR. Estimated Price Range: Between $5,000,000 and $10,000,000 Tentative Solicitation Date: January/February 2027 Tentative Fixed Completion Date: Base: July 2027 Option X: July 2027 Option Y: September 2027 Option Z: August 2027 INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable…

Documents, amendments and submission instructions are on the agency's own posting.