GovConBids Log inCreate account

← All bids

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel

DEPT OF DEFENSE — DEPT OF THE ARMY·AL*·RFP·Federal

Scope

The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.

Documents, amendments and submission instructions are on the agency's own posting.