61--PANEL,CONTROL,ELECT, IN REPAIR/MODIFICATION OF
Scope
CONTACT INFORMATION|4|N732.76|N00383|771-229-2959|[email protected]| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo||TBD|N00383|TBD|TBD|See schedule|TBD|See schedule|||||||| This RFQ is for repair requirement. Repair Turnaround Time (RTAT): the resultant contractual delivery requirementis measured from asset Return to the date of asset acceptance under the termsof the contract. For purposes of this section, Return is defined as physicalreceipt of the F-condition asset at the contractor?s facility as reflected inthe Action Date entry in the Commercial Asset Visibility (CAV) system. Inaccordance with the CAV Statement of Work, the contractor is required toaccurately report all transactions by the end of the fifth regular businessday after receipt and the Action Date entered in CAV must be dated to reflectthe actual date of…
Documents, amendments and submission instructions are on the agency's own posting.