La Palma Alleys Sewer Improvement Project
Scope
These proposed improvements will address the capacity and operational deficiencies under the existing conditions for the area shown in Exhibit A . The sewer systems were constructed with 6” minimum diameter instead of the City's current minimum standard 8-inches in diameter. This old 6-inch pipe is experiencing significant maintenance problems such as offset joints and root intrusion and its improvement is a priority for the City. Implementation of this program will improve the overall performance, reduce maintenance costs, ensure capacity for future developments, and maintain the reliability of the sewer system. The City of Anaheim Public Works Operations team has identified a previously unknown sag or siphon between manholes SW070319 and SW071102 in La Palma Ave. This segment has caused operational issues. This project will identify solutions to remove this operational…
Documents, amendments and submission instructions are on the agency's own posting.